Website Update – March 29, 2024

National Grid’s contractor, Posillico Environmental, Inc. (Posillico), is implementing interim remedial measure (IRM) activities at the K-Equity Works former Manufactured Gas Plant (MGP) Site to address MGP Site related impacts in accordance with the New York State Department of Environmental Conservation (NYSDEC) approved design. The IRM activities are being performed at 222 Maspeth Avenue, Brooklyn, NY, with a support area across the street at 287 Maspeth Avenue. Mobilization began on June 26, 2023, with full time work activities starting on July 31, 2023. Community air monitoring and vibration monitoring are being conducted during this project.

Overview:

  • The key elements of the remediation work include:
    • Underpinning of certain site structures,
    • Removal of surficial concrete;
    • Shallow excavation;
    • In-situ soil stabilization / solidification;
    • Deep excavation under a temporary tent structure; and
    • Site restoration.
  • There are established measures to reduce potential noise, vibration, and dust from the work.
  • Air, noise, and vibration monitoring are being conducted each day to ensure that the work is conducted in accordance with the requirements of NYSDEC, New York State Department of Health (NYSDOH) and New York City (NYC). 

On-going activities:

  • Import (trucking) of reagents to support in-situ soil stabilization / solidification at 222 Maspeth Avenue.
  • Installation of temporary support along east wall at 222 Maspeth Avenue.
  • Soil excavation and work platform construction in support of In-situ soil stabilization / solidification at 222 Maspeth Avenue.
  • In-situ soil stabilization / solidification at 222 Maspeth Avenue.
  • On-site soil management of excavated soil and debris in preparation for trucking loadout and off-site disposal.
  • Transportation (trucking) and offsite removal of excavated soil and misc. debris at 222 Maspeth Avenue.
  • Air, noise, and vibration monitoring.

Recently completed activities:

  • None – all activities are currently ongoing.

Upcoming work activities:

The current on-going activities described above are expected to continue through June 2024.

Community Air Monitoring Plan Summary

Continuous community air monitoring is on-going.  For the period between 03/16/2024 through 03/29/2024, there were no measured readings above action levels associated with site activities for Total Volatile Organic Compounds (TVOC) or Particulate Matter (PM-10).